chore: raise the validator's budget and record the runs of cases 02, 03 and 04

- Validator budget 15 to 30: recording verdicts in pieces for 100 Checks
  used all 15 calls in one attempt.
- Plans record three runs on 2026-10-08:
  case 02 completed at 100% with no Revision in 24 minutes;
  case 03 completed at 100% with two Revisions of the design in 40 minutes;
  case 04 (interactive) ended with warnings at 75%, on two router faults:
  a reply that echoes the question is read as a change request, and the
  router loops at the Revision limit. Neither is fixed here.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
2026-10-08 13:16:36 +01:00
parent 58e778ca7a
commit 4e7a16cedd
8 changed files with 45 additions and 9 deletions

View File

@@ -11,7 +11,7 @@ One directory per iteration of this agent. Each holds the plan for that iteratio
| 3 | `iter-03-kab-layout/` | complete (commit `7ee49ab`) | The container starts the new engine, the engine moved into the KAB workflow-agent folder layout, and the original pipeline was deleted. |
| 4 | `iter-04-learning-and-skills/` | steps 1–8, 11, 13 and 15–24 built; case 01 completed on them on 2026-10-07 (18 minutes against 60, 100%, no Revision); cases 02 to 04 have not run; 9 awaits the owner; 10, 12 and 14 planned | The enhancement backlog from the 2026-10-06 review: cheap fixes, the learning loop through Skills, overlay Skills, provider neutrality. Steps 17–20 are the speed-ups from the 2026-10-07 run: a working copy for files and the graph, a provider schema lookup, routing a Check the code cannot meet, and a model timeout per role. |
| 5 | `iter-05-jev-decisions/` | the Jev client and the Orchestrator router are built (steps 2, 11, 12), unverified against the live service; the rest planned | Jev (a hosted decision model) for the agent's closed decisions: checks, routing, context selection. |
| 6 | `iter-06-target-architecture-graph/` | steps 1–10 built; cases 01 and 02 pass with real models; cases 03 and 04 outstanding | The Target architecture as one explicit graph of Elements, Relationships and Checks, established before infrastructure code, with validation as a verdict per Check. |
| 6 | `iter-06-target-architecture-graph/` | steps 1–10 built; cases 01, 02 and 03 pass with real models; case 04 (interactive) ends with warnings on two router faults | The Target architecture as one explicit graph of Elements, Relationships and Checks, established before infrastructure code, with validation as a verdict per Check. |
| 7 | `iter-07-change-requests/` | planned; ADR-0006 accepted 2026-10-07; follows iteration 6; its step 8 (removing `deliverables/cases/legacy-baseline/`) was done early on the owner's instruction | A user restates a request to say how requirements changed; a new Execution starts from a Baseline Execution of the same Customer case and delivers the updated architecture with what changed. |
Numbers record when an iteration was planned, not the order to build in. Build iteration 6 before the remaining steps of iteration 4 (10 to 14) and before iteration 5: it changes the Deliverables, Phases and validation format they build on. Its `MAP.md` lists the effect on each of their steps.