feat: scoping is the first Phase, completed in conversation (iteration 9 step 2)
Some checks failed
validation / verify (push) Failing after 10s
Some checks failed
validation / verify (push) Failing after 10s
Every Execution now begins by agreeing the scope, before requirements. - A new Phase and Deliverable, produced by a scope analyst with two tools: scope_read shows what is settled and what is not; scope_set records fields with where each value came from (the request, the customer's answer, or an assumption with its reason). Code checks each value against the catalogue. - With someone present the analyst asks for what is missing; with nobody present it assumes it, visibly. With no spec it drafts one from the request. A value the customer stated in the file is changed only by their own answer. - A submission cannot leave an essential field unknown. Code writes the completed spec, the data every later Specialist reads, and the information register, from what was recorded. - The spec's status follows the Execution: under review, approved, then locked as a Baseline. A Change request starts from the delivered scope. - The requirements analyst derives from the agreed scope and no longer asks for what it settles. About 80 tests assumed requirements came first; tests/scoped.py runs scoping ahead of a test's own script, and tests about order and counts are updated. Not run with real models. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
@@ -14,7 +14,7 @@ One directory per iteration of this agent. Each holds the plan for that iteratio
|
||||
| 6 | `iter-06-target-architecture-graph/` | complete: all four cases pass with real models, each run twice on 2026-10-08; thresholds set | The Target architecture as one explicit graph of Elements, Relationships and Checks, established before infrastructure code, with validation as a verdict per Check. |
|
||||
| 7 | `iter-07-change-requests/` | complete (2026-10-09): the change case ran with real models and passed | A user restates a request to say how requirements changed; a new Execution starts from a Baseline Execution of the same Customer case and delivers the updated architecture with what changed. |
|
||||
| 8 | `iter-08-terraform-modules/` | steps 1–5 built and run once each way on 2026-10-09, both at 100%; steps 6 and 7 wait on Azure and AWS provider bundles | Infrastructure code is plain resources by default. An Execution may opt into published Terraform modules: only from registry namespaces the provider bundle lists, at one exact version, with a lookup of what a module accepts and a Skill of four Google modules tested against the pinned provider. |
|
||||
| 9 | `iter-09-scoping/` | step 1 built on 2026-10-11, not run with real models; steps 2–6 planned; ADR-0008 accepted | An engagement is scoped from a scope spec: a structured file, complete or partly filled, read against a catalogue in code, completed in conversation and approved before requirements begin. Covers workloads and platform foundations. |
|
||||
| 9 | `iter-09-scoping/` | steps 1, 2 and 6 built on 2026-10-11, not run with real models; steps 3–5 planned; ADR-0008 accepted | An engagement is scoped from a scope spec: a structured file, complete or partly filled, read against a catalogue in code, completed in conversation and approved before requirements begin. Covers workloads and platform foundations. |
|
||||
| 10 | `iter-10-work-breakdown/` | planned; nothing built | A work breakdown structure as a Deliverable: work packages traced to Elements and Checks, activities in sequence, and a timeline on a relative day axis computed and drawn by code. |
|
||||
|
||||
Numbers record when an iteration was planned, not the order to build in. Build iteration 6 before the remaining steps of iteration 4 (10 to 14) and before iteration 5: it changes the Deliverables, Phases and validation format they build on. Its `MAP.md` lists the effect on each of their steps.
|
||||
|
||||
Reference in New Issue