fix: a changed functional requirement is reached through its components
The change-case check asked for a changed Check whose source is the changed requirement. A functional requirement is carried by the components that serve it, so it is reached through a Check on an Element realising one. Plans record the first Change request with real models: a retention change made in 18 minutes for a third of its Baseline's tokens, touching seven Checks on one Element and nothing else, and the regression runs of cases 02, 03 and 04, all at 100%. Iteration 7 is complete. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
@@ -12,7 +12,7 @@ One directory per iteration of this agent. Each holds the plan for that iteratio
|
||||
| 4 | `iter-04-learning-and-skills/` | steps 1–8, 11, 13 and 15–27 built; cases 01, 02 and 03 completed at 100% on them on 2026-10-07 and 08; ADR-0004 accepted 2026-10-08 (step 9); 10, 12 and 14 planned | The enhancement backlog from the 2026-10-06 review: cheap fixes, the learning loop through Skills, overlay Skills, provider neutrality. Steps 17–20 are the speed-ups from the 2026-10-07 run: a working copy for files and the graph, a provider schema lookup, routing a Check the code cannot meet, and a model timeout per role. |
|
||||
| 5 | `iter-05-jev-decisions/` | the Jev client and the Orchestrator router are built (steps 2, 11, 12), unverified against the live service; the rest planned | Jev (a hosted decision model) for the agent's closed decisions: checks, routing, context selection. |
|
||||
| 6 | `iter-06-target-architecture-graph/` | complete: all four cases pass with real models, each run twice on 2026-10-08; thresholds set | The Target architecture as one explicit graph of Elements, Relationships and Checks, established before infrastructure code, with validation as a verdict per Check. |
|
||||
| 7 | `iter-07-change-requests/` | steps 1–6 and 8 built (2026-10-09), tested with scripted agents only; step 7's evaluation case is built and its run is outstanding | A user restates a request to say how requirements changed; a new Execution starts from a Baseline Execution of the same Customer case and delivers the updated architecture with what changed. |
|
||||
| 7 | `iter-07-change-requests/` | complete (2026-10-09): the change case ran with real models and passed | A user restates a request to say how requirements changed; a new Execution starts from a Baseline Execution of the same Customer case and delivers the updated architecture with what changed. |
|
||||
|
||||
Numbers record when an iteration was planned, not the order to build in. Build iteration 6 before the remaining steps of iteration 4 (10 to 14) and before iteration 5: it changes the Deliverables, Phases and validation format they build on. Its `MAP.md` lists the effect on each of their steps.
|
||||
|
||||
|
||||