fix: a changed functional requirement is reached through its components

The change-case check asked for a changed Check whose source is the changed
requirement. A functional requirement is carried by the components that
serve it, so it is reached through a Check on an Element realising one.

Plans record the first Change request with real models: a retention change
made in 18 minutes for a third of its Baseline's tokens, touching seven
Checks on one Element and nothing else, and the regression runs of cases
02, 03 and 04, all at 100%. Iteration 7 is complete.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
2026-10-09 13:50:18 +01:00
parent 5ef434d00e
commit 59a641fded
6 changed files with 89 additions and 11 deletions

View File

@@ -2,7 +2,7 @@
**Iteration:** 7, Change requests
**Intent:** Let a user restate a request to say how their requirements have changed, at a high level, and receive the delivered architecture updated from where it stood, with an account of what changed and why.
**Status:** steps 1 to 6 and 8 built (2026-10-09), covered by the deterministic suite; no Change request has run with real models. Step 7's evaluation case and checks are built and its run is outstanding
**Status:** complete (2026-10-09). The change case ran with real models: a retention change was made in 18 minutes for a third of its Baseline's tokens, touching seven Checks on one Element and nothing else (`steps/step-7.md`)
**This directory covers:** steps 1 to 8
## Sources of truth
@@ -17,12 +17,12 @@
| Step | What | Size | Status |
|---|---|---|---|
| 1 | Accept ADR-0006 and update the glossary | S | complete: accepted 2026-10-07 |
| 2 | Start an Execution against a Baseline | M | built; not run with real models |
| 3 | Requirements revised with a change record | M | built; not run with real models |
| 4 | Later Specialists revise from the Baseline | M | built; not run with real models |
| 5 | Approvals show the change | S | built; not run with real models |
| 6 | Change summary and version line in the case | S | built; not run with real models |
| 7 | Evaluation: a change case | M | case and checks built; run outstanding |
| 2 | Start an Execution against a Baseline | M | complete |
| 3 | Requirements revised with a change record | M | complete |
| 4 | Later Specialists revise from the Baseline | M | complete |
| 5 | Approvals show the change | S | complete |
| 6 | Change summary and version line in the case | S | complete |
| 7 | Evaluation: a change case | M | complete: one run, all change checks pass |
| 8 | Remove the `legacy-baseline` case | S | complete: removed early on the owner's instruction, 2026-10-07 |
## Dependency graph