feat: keep an unchanged description, list conditions, review coverage with Jev

After case 02 (completed at 100%, but with two Revisions of the Target
architecture for gaps validation found one pass at a time):

- A Deliverable stands while what it was written from is unchanged. The
  architecture description is written from the Elements and Relationships,
  so a Revision that only adds or rewords Checks no longer runs the describer.
- Non-functional requirements and recommendations list their conditions,
  one entry per separate thing that must be true; submission requires them.
- A coverage review at submission (JEV_COVERAGE_REVIEW, off by default):
  for each condition, Jev chooses which Check verifies it, or none. Asked as
  one broad yes-or-no per requirement it could not tell a complete design
  from one with known gaps; asked as a choice per condition it raised all
  four known gaps of case 02 and nothing on the complete graph. An opt-in
  live test (LIVE_JEV=1) repeats that.
- The validator is told to report every gap in its first pass.

Plans record the case 02 run and both forms of the review with figures.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
2026-10-07 20:58:38 +01:00
parent f1f6f1b83a
commit 5adc911a82
29 changed files with 1687 additions and 16 deletions

View File

@@ -9,9 +9,9 @@ One directory per iteration of this agent. Each holds the plan for that iteratio
| 1 | `wf-decompose-65ea49fc2d04/` | complete, superseded | The decomposer's scaffold: a linear four-phase pipeline of template functions. Its code was deleted in iteration 3 and survives only in git history. Generated by the platform decomposer; leave its files as written. |
| 2 | `iter-02-solution-architect-agent/` | complete; step 9 was done in iteration 3 | The rebuild as a hierarchical ReAct agent: Orchestrator, one Specialist per Deliverable, Skills, provider bundle, A2A. |
| 3 | `iter-03-kab-layout/` | complete (commit `7ee49ab`) | The container starts the new engine, the engine moved into the KAB workflow-agent folder layout, and the original pipeline was deleted. |
| 4 | `iter-04-learning-and-skills/` | steps 1–8, 11, 13 and 15–20 built; case 01 completed on them on 2026-10-07 (18 minutes against 60, 100%, no Revision); cases 02 to 04 have not run; 9 awaits the owner; 10, 12 and 14 planned | The enhancement backlog from the 2026-10-06 review: cheap fixes, the learning loop through Skills, overlay Skills, provider neutrality. Steps 17–20 are the speed-ups from the 2026-10-07 run: a working copy for files and the graph, a provider schema lookup, routing a Check the code cannot meet, and a model timeout per role. |
| 4 | `iter-04-learning-and-skills/` | steps 1–8, 11, 13 and 15–22 built; case 01 completed on them on 2026-10-07 (18 minutes against 60, 100%, no Revision); cases 02 to 04 have not run; 9 awaits the owner; 10, 12 and 14 planned | The enhancement backlog from the 2026-10-06 review: cheap fixes, the learning loop through Skills, overlay Skills, provider neutrality. Steps 17–20 are the speed-ups from the 2026-10-07 run: a working copy for files and the graph, a provider schema lookup, routing a Check the code cannot meet, and a model timeout per role. |
| 5 | `iter-05-jev-decisions/` | the Jev client and the Orchestrator router are built (steps 2, 11, 12), unverified against the live service; the rest planned | Jev (a hosted decision model) for the agent's closed decisions: checks, routing, context selection. |
| 6 | `iter-06-target-architecture-graph/` | steps 1–10 built; case 01 passes with real models; cases 02–04 outstanding | The Target architecture as one explicit graph of Elements, Relationships and Checks, established before infrastructure code, with validation as a verdict per Check. |
| 6 | `iter-06-target-architecture-graph/` | steps 1–10 built; cases 01 and 02 pass with real models; cases 03 and 04 outstanding | The Target architecture as one explicit graph of Elements, Relationships and Checks, established before infrastructure code, with validation as a verdict per Check. |
| 7 | `iter-07-change-requests/` | planned; ADR-0006 accepted 2026-10-07; follows iteration 6; its step 8 (removing `deliverables/cases/legacy-baseline/`) was done early on the owner's instruction | A user restates a request to say how requirements changed; a new Execution starts from a Baseline Execution of the same Customer case and delivers the updated architecture with what changed. |
Numbers record when an iteration was planned, not the order to build in. Build iteration 6 before the remaining steps of iteration 4 (10 to 14) and before iteration 5: it changes the Deliverables, Phases and validation format they build on. Its `MAP.md` lists the effect on each of their steps.