**Iteration:** 4, learning and Skills
|
||||
**Intent:** Make the agent a learning, adaptable solution through Skills. Fix the cheap defects the 2026-10-06 review found, then close the loop so each Execution can improve the next through a reviewed Skill change, then let new standards, clients and Cloud providers arrive as Skills and configuration.
|
||||
**Status:** steps 1 to 8 and 15 built; no evaluation run has completed on them (see `steps/step-8.md`); step 9 drafted and awaiting the owner; steps 10 to 14 planned. Steps 1 to 6 are in commit `7ee49ab`; 7, 8 and 15 are uncommitted.
|
||||
**Status:** steps 1 to 8, 11, 13 and 15 to 20 built; no evaluation run has completed on any of them (see `steps/step-8.md`), so every "tokens fall" or "Revisions fall" criterion is unmeasured; step 9 drafted and awaiting the owner; steps 10, 12 and 14 planned. Steps 1 to 6 are in commit `7ee49ab`; the rest are uncommitted.
|
||||
**Changed by iteration 6:** `docs/adr/0005-the-target-architecture-is-an-explicit-graph.md` (accepted 2026-10-07) replaces the free-form `findings.json` of step 1 with a verdict per Check, remove the diagrammer, and add a Phase. Its plan is `../iter-06-target-architecture-graph/`, which lists the effect on each step here and should be built before steps 10 to 14.
|
||||
**This directory covers:** steps 1 to 16
|
||||
**This directory covers:** steps 1 to 20
|
||||
|
||||
## Sources of truth
|
||||
|
||||
@@ -27,12 +27,16 @@
|
||||
| 8 | Evaluation that can see improvement | B | M | built; thresholds and a judged run outstanding |
|
||||
| 9 | ADR: the lessons loop and overlay Skills | B | S | drafted as `docs/adr/0004-lessons-and-overlays-arrive-as-skills.md`, status proposed; awaits the owner |
|
||||
| 10 | Lessons Skill and lesson curator | B | L | planned |
|
||||
| 11 | IaC patterns Skill | B | M | planned |
|
||||
| 11 | IaC patterns Skill | B | M | built; every pattern validates; effect on Revisions and tokens unmeasured |
|
||||
| 12 | Overlay Skills and an organisation standards Skill | C | M | planned |
|
||||
| 13 | Trim Specialist context | C | M | planned |
|
||||
| 13 | Trim Specialist context | C | M | built; effect on tokens unmeasured |
|
||||
| 14 | Provider-owned contracts | C | M | planned |
|
||||
| 15 | Group Executions by Customer case | added | S | complete |
|
||||
| 16 | Cache Terraform providers between checks | added | S | complete |
|
||||
| 17 | A working copy for files and for the graph | added | M | built; effect on time and tokens unmeasured |
|
||||
| 18 | Provider schema lookup and one pinned provider version | added | S | built; checked against the real provider |
|
||||
| 19 | A Check the code cannot meet goes back to the Target architecture | added | S | built |
|
||||
| 20 | A model timeout per role | added | S | built |
|
||||
|
||||
Size: S under a day, M a few days, L a week or more. Group A is cheap fixes that also create signal. Group B is the learning loop. Group C is adaptability.
|
||||
|
||||
@@ -49,5 +53,7 @@ Size: S under a day, M a few days, L a week or more. Group A is cheap fixes that
|
||||
- Step 14: depends on step 4
|
||||
- Step 15: no dependencies (added on 2026-10-06 at the owner's request)
|
||||
- Step 16: no dependencies (added on 2026-10-07 at the owner's request)
|
||||
- Steps 17 to 20: no dependencies (added on 2026-10-07 at the owner's request, from the causes of the 60 minute run recorded in `../iter-06-target-architecture-graph/steps/`)
|
||||
- Step 11 uses step 18's pinned provider version; step 19 uses step 18's lookup to find the Checks it reports
|
||||
|
||||
Step 8 comes before steps 10, 11 and 13 so each of them can be shown to help: same quality, fewer Revisions, seconds or tokens.
|
||||
|
||||