feat: Change requests against a Baseline (ADR-0006)

A caller restates a request to say how requirements have changed, naming a
completed Execution of the same Customer case as the Baseline.

- app/baseline.py reads a Baseline from its files and refuses one that
  does not exist, did not complete or belongs to another case, before
  anything runs or is recorded. A Baseline is never modified.
- Requirements carry a change (unchanged, added, changed, removed) and a
  reason. Submission is refused when a Baseline requirement disappears, an
  id is reused, or an unchanged requirement's text differs. A removed
  requirement stays on record and asks nothing downstream.
- Each Specialist starts from its delivered version; the graph and the code
  are its working copy, and the description is carried over when the
  design's shape is the same.
- app/workflows/changes.py compares versions by id and traces what each
  changed requirement reaches; anything else that changed is listed as
  unrequested. Approvals show the change for their Phase, and changes.json
  is written with the full Deliverables.
- Intake no longer starts a message read as a change: it names the
  Execution to give as the Baseline.
- A fifth evaluation case runs a request and then a change to it, with
  four checks that the change is recorded, reaches Checks, stays contained
  and costs less than its Baseline.

Tested with scripted agents only; no Change request has run with real
models.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
2026-10-09 11:38:15 +01:00
parent db28d02f56
commit 5ef434d00e
32 changed files with 1824 additions and 40 deletions

View File

@@ -12,7 +12,7 @@ One directory per iteration of this agent. Each holds the plan for that iteratio
| 4 | `iter-04-learning-and-skills/` | steps 1–8, 11, 13 and 15–27 built; cases 01, 02 and 03 completed at 100% on them on 2026-10-07 and 08; ADR-0004 accepted 2026-10-08 (step 9); 10, 12 and 14 planned | The enhancement backlog from the 2026-10-06 review: cheap fixes, the learning loop through Skills, overlay Skills, provider neutrality. Steps 17–20 are the speed-ups from the 2026-10-07 run: a working copy for files and the graph, a provider schema lookup, routing a Check the code cannot meet, and a model timeout per role. |
| 5 | `iter-05-jev-decisions/` | the Jev client and the Orchestrator router are built (steps 2, 11, 12), unverified against the live service; the rest planned | Jev (a hosted decision model) for the agent's closed decisions: checks, routing, context selection. |
| 6 | `iter-06-target-architecture-graph/` | complete: all four cases pass with real models, each run twice on 2026-10-08; thresholds set | The Target architecture as one explicit graph of Elements, Relationships and Checks, established before infrastructure code, with validation as a verdict per Check. |
| 7 | `iter-07-change-requests/` | planned; ADR-0006 accepted 2026-10-07; follows iteration 6; its step 8 (removing `deliverables/cases/legacy-baseline/`) was done early on the owner's instruction | A user restates a request to say how requirements changed; a new Execution starts from a Baseline Execution of the same Customer case and delivers the updated architecture with what changed. |
| 7 | `iter-07-change-requests/` | steps 1–6 and 8 built (2026-10-09), tested with scripted agents only; step 7's evaluation case is built and its run is outstanding | A user restates a request to say how requirements changed; a new Execution starts from a Baseline Execution of the same Customer case and delivers the updated architecture with what changed. |
Numbers record when an iteration was planned, not the order to build in. Build iteration 6 before the remaining steps of iteration 4 (10 to 14) and before iteration 5: it changes the Deliverables, Phases and validation format they build on. Its `MAP.md` lists the effect on each of their steps.