feat: Change requests against a Baseline (ADR-0006)
A caller restates a request to say how requirements have changed, naming a completed Execution of the same Customer case as the Baseline. - app/baseline.py reads a Baseline from its files and refuses one that does not exist, did not complete or belongs to another case, before anything runs or is recorded. A Baseline is never modified. - Requirements carry a change (unchanged, added, changed, removed) and a reason. Submission is refused when a Baseline requirement disappears, an id is reused, or an unchanged requirement's text differs. A removed requirement stays on record and asks nothing downstream. - Each Specialist starts from its delivered version; the graph and the code are its working copy, and the description is carried over when the design's shape is the same. - app/workflows/changes.py compares versions by id and traces what each changed requirement reaches; anything else that changed is listed as unrequested. Approvals show the change for their Phase, and changes.json is written with the full Deliverables. - Intake no longer starts a message read as a change: it names the Execution to give as the Baseline. - A fifth evaluation case runs a request and then a change to it, with four checks that the change is recorded, reaches Checks, stays contained and costs less than its Baseline. Tested with scripted agents only; no Change request has run with real models. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
@@ -2,12 +2,12 @@
|
||||
|
||||
**Iteration:** 7, Change requests
|
||||
**Intent:** Let a user restate a request to say how their requirements have changed, at a high level, and receive the delivered architecture updated from where it stood, with an account of what changed and why.
|
||||
**Status:** planned. ADR-0006 was accepted on 2026-10-07 and the glossary updated (step 1). Build after iteration 6 step 11 has a passing evaluation run
|
||||
**Status:** steps 1 to 6 and 8 built (2026-10-09), covered by the deterministic suite; no Change request has run with real models. Step 7's evaluation case and checks are built and its run is outstanding
|
||||
**This directory covers:** steps 1 to 8
|
||||
|
||||
## Sources of truth
|
||||
|
||||
- `docs/adr/0006-a-change-request-starts-from-a-baseline-execution.md`: the decision and its four points to confirm. Status `proposed`.
|
||||
- `docs/adr/0006-a-change-request-starts-from-a-baseline-execution.md`: the decision and its four points. Accepted 2026-10-07.
|
||||
- `docs/adr/0005-the-target-architecture-is-an-explicit-graph.md` and `../iter-06-target-architecture-graph/`: the ids along the Requirements chain that a change is traced through. Build iteration 6 first.
|
||||
- `CONTEXT.md`: today it says an Execution starts clean and a Customer case never feeds one Execution into another. Step 1 changes those entries; until then they stand.
|
||||
- `iter-04-learning-and-skills/steps/step-15.md`: the Customer case layout, `execution.json` and the Intent history (`intent/history.json`) that a Baseline is found through. A Change request is the next statement in that history.
|
||||
@@ -17,12 +17,12 @@
|
||||
| Step | What | Size | Status |
|
||||
|---|---|---|---|
|
||||
| 1 | Accept ADR-0006 and update the glossary | S | complete: accepted 2026-10-07 |
|
||||
| 2 | Start an Execution against a Baseline | M | planned |
|
||||
| 3 | Requirements revised with a change record | M | planned |
|
||||
| 4 | Later Specialists revise from the Baseline | M | planned |
|
||||
| 5 | Approvals show the change | S | planned |
|
||||
| 6 | Change summary and version line in the case | S | planned |
|
||||
| 7 | Evaluation: a change case | M | planned |
|
||||
| 2 | Start an Execution against a Baseline | M | built; not run with real models |
|
||||
| 3 | Requirements revised with a change record | M | built; not run with real models |
|
||||
| 4 | Later Specialists revise from the Baseline | M | built; not run with real models |
|
||||
| 5 | Approvals show the change | S | built; not run with real models |
|
||||
| 6 | Change summary and version line in the case | S | built; not run with real models |
|
||||
| 7 | Evaluation: a change case | M | case and checks built; run outstanding |
|
||||
| 8 | Remove the `legacy-baseline` case | S | complete: removed early on the owner's instruction, 2026-10-07 |
|
||||
|
||||
## Dependency graph
|
||||
|
||||