feat: all four evaluation cases pass; intake, checklist review, thresholds
Case 04 (interactive) - A scripted answer may name who it is for, so facts written for requirements discovery are not given to a Specialist confirming a draft. - A reply that restates what the agreed requirements already say is read as an answer, not a request for changes. - With a user present, a first submission is refused until the user has been shown a draft of that Deliverable (CONFIRM_DRAFTS). Routing and reviews - Intake: a message that starts something is read first. A question is answered and starts nothing; a change to delivered work starts as a new request with a note, until Change requests are built. - Requirements and recommendations list what infrastructure code can show (conditions) apart from what it cannot (outside_code); the latter needs no Check and validation proposes nothing for it. - A requirements review, "names no products", behind its own switch (off). - Each pillar advisor reviews its pillar's checklist; the engine writes the reviews into the design recommendations. The judged checklist check went from 9-45% a pillar to 100% in one run of case 04. Evaluation - Per-case thresholds for Revisions, seconds and tokens, set from every completed run on this build. - A progress file after every agent run, so an interrupted run keeps its time and tokens. - eval/calibrate_judge.py with a 32-question set awaiting a person's labels. Unlabelled: Jev stable at 1.00, Gemini 0.92, agreeing on 0.91. Smaller - An Execution that ends with warnings writes its Deliverables, with the warnings and each status in the manifest. - CI installs the application's dependencies before linting and testing. - A load-balancer pattern in the IaC patterns Skill. Plans record nine runs of 2026-10-08. Iteration 6 is complete. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
@@ -4,7 +4,7 @@
|
||||
**Intent:** Make the agent a learning, adaptable solution through Skills. Fix the cheap defects the 2026-10-06 review found, then close the loop so each Execution can improve the next through a reviewed Skill change, then let new standards, clients and Cloud providers arrive as Skills and configuration.
|
||||
**Status:** steps 1 to 8, 11, 13 and 15 to 20 built; case 01 completed on them on 2026-10-07 (`../iter-06-target-architecture-graph/steps/step-11.md`); the other cases have not run, so no criterion is measured across the benchmark; step 9 complete (ADR-0004 accepted 2026-10-08), which unblocks steps 10 and 12; steps 10, 12 and 14 planned. Steps 1 to 6 are in commit `7ee49ab`; the rest are uncommitted.
|
||||
**Changed by iteration 6:** `docs/adr/0005-the-target-architecture-is-an-explicit-graph.md` (accepted 2026-10-07) replaces the free-form `findings.json` of step 1 with a verdict per Check, remove the diagrammer, and add a Phase. Its plan is `../iter-06-target-architecture-graph/`, which lists the effect on each step here and should be built before steps 10 to 14.
|
||||
**This directory covers:** steps 1 to 24
|
||||
**This directory covers:** steps 1 to 27
|
||||
|
||||
## Sources of truth
|
||||
|
||||
@@ -19,12 +19,12 @@
|
||||
|---|---|---|---|---|
|
||||
| 1 | Structured validator findings | A | S | replaced by iteration 6 step 9 (verdicts per Check) |
|
||||
| 2 | Carry the draft through `needs_input` | A | S | complete |
|
||||
| 3 | Reuse pillar advice across Revisions | A | S | built; evaluation run outstanding |
|
||||
| 3 | Reuse pillar advice across Revisions | A | S | built; no run has revised design recommendations, so unexercised by evaluation |
|
||||
| 4 | Single source for Deliverable contracts | A | S | complete |
|
||||
| 5 | Cap parallel Specialists | A | S | complete |
|
||||
| 6 | Orchestrator step order | A | S | built; seen working in one stopped run, no completed evaluation |
|
||||
| 7 | Capture lesson candidates | B | M | complete |
|
||||
| 8 | Evaluation that can see improvement | B | M | built; thresholds and a judged run outstanding |
|
||||
| 8 | Evaluation that can see improvement | B | M | complete: thresholds set and four judged runs done on 2026-10-08 |
|
||||
| 9 | ADR: the lessons loop and overlay Skills | B | S | complete: ADR-0004 accepted 2026-10-08 |
|
||||
| 10 | Lessons Skill and lesson curator | B | L | planned |
|
||||
| 11 | IaC patterns Skill | B | M | built; in case 01 the IaC author fell from 57 requests to 11 with no Revision; other cases unmeasured |
|
||||
@@ -41,6 +41,9 @@
|
||||
| 22 | Validation reports every gap in one pass | added | S | instructions changed; with conditions listed, case 02 ran with 102 Checks and no Revision |
|
||||
| 23 | Validation recorded a few verdicts at a time | added | S | built; in case 02 a validator run cut short carried on and submitted in 68 seconds, with no timeout |
|
||||
| 24 | The design checked against the provider's schema, in code | added | S | built; measured on two passed designs and the known faults; raised nothing in case 02, which had no unimplementable Check |
|
||||
| 25 | An Execution that ends with warnings keeps its files | added | S | complete |
|
||||
| 26 | Each pillar's checklist is reviewed and the review is in the Deliverable | added | S | built; a judged run of case 04 scored the checklist check at 100% on every pillar |
|
||||
| 27 | A user sees a Deliverable before it is first submitted | added | S | built; a hole found by a run and closed; not rerun |
|
||||
|
||||
Size: S under a day, M a few days, L a week or more. Group A is cheap fixes that also create signal. Group B is the learning loop. Group C is adaptability.
|
||||
|
||||
|
||||