decomposer: record implementation detail for 8 step(s)

This commit is contained in:
2026-09-01 19:47:40 +00:00
parent d73472eed4
commit 9bfdf6eca3
8 changed files with 51 additions and 0 deletions

View File

@@ -0,0 +1,7 @@
# Step 0 — Implementation Detail
1. Recorded workflow repository and template provenance.
2. Separated functional requirements from non-functional requirements.
3. Recorded deployment, Terraform, and scope constraints.
4. Recorded workload assumptions and unresolved throughput, compliance, downstream, and SLO questions.
5. Set product_selection_deferred to true and verified it with a repository test.

View File

@@ -0,0 +1,8 @@
# Step 1 — Implementation Detail
1. Mapped ingress and worker execution to Cloud Run.
2. Mapped durable transport and retries to Pub/Sub.
3. Mapped raw-event retention and replay to Cloud Storage.
4. Added Artifact Registry, IAM service account, Logging, and Monitoring foundations.
5. Wrote architecture.md and architecture.mmd.
6. Added Terraform provider constraints, APIs, service account, bucket, topic, subscription, repository, Cloud Run service, IAM binding, variables, and outputs.

View File

@@ -0,0 +1,7 @@
# Step 2 — Implementation Detail
1. Added scripts/validate.sh with terraform fmt -check -diff.
2. Added backendless terraform init and terraform validate commands.
3. Added refresh-free, lock-free terraform plan with no apply path.
4. Made plan execution fail clearly when required variables are absent.
5. Recorded the environment-dependent validation findings in validation-results.json and the guide.

View File

@@ -0,0 +1,7 @@
# Step 3 — Implementation Detail
1. Assembled the deferred-selection discovery section.
2. Documented selected products and their responsibilities.
3. Embedded the Mermaid architecture diagram.
4. Documented Terraform files and plan-only behavior.
5. Documented validation commands, pending execution status, and production follow-ups.

View File

@@ -0,0 +1,5 @@
# Step 4 — Implementation Detail
1. Created the exact required guide path.
2. Included the complete packaged guide content.
3. Added repository tests asserting the guide and companion artifacts exist.

View File

@@ -0,0 +1,7 @@
# Step 5 — Implementation Detail
1. Declared the workflow_agent source template URL.
2. Declared phase inputs and outputs for all four phases.
3. Marked discovery product selection as deferred.
4. Marked validation as deploy_resources false.
5. Added tests for required artifact presence and workflow implementation files.

View File

@@ -0,0 +1,5 @@
# Step 6 — Implementation Detail
1. Committed all workflow, requirements, architecture, Terraform, validation, test, and guide files together.
2. Published the repository at the returned remote URL.
3. Included README instructions for the actual validation commands.

View File

@@ -0,0 +1,5 @@
# Step 7 — Implementation Detail
1. Used the exact scaffold-returned repository URL.
2. Confirmed the scaffold operation reported 15 generated files committed.
3. Preserved the limitation that no revision identifier was exposed for independent remote verification.