feat: the lessons loop, and six lessons approved and published
Capture, distil, review, publish, retire (ADR-0004). Lesson candidates of past Executions are grouped into what recurred; a lesson-curator role, outside any Execution, proposes a lesson per group worth one; each proposal is an issue file a person approves or rejects; an approved lesson is written into the provider's lessons Skill, which a Specialist is given only once it holds lessons for that Specialist's Deliverable. LESSONS_ENABLED off runs without them, for an evaluation with and without. The curator proposed six lessons from 21 Executions. The owner approved all six on 2026-10-09 and they are published: five for the target architect, one for the IaC author. None is proved by an evaluation yet. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
@@ -9,7 +9,7 @@ One directory per iteration of this agent. Each holds the plan for that iteratio
|
||||
| 1 | `wf-decompose-65ea49fc2d04/` | complete, superseded | The decomposer's scaffold: a linear four-phase pipeline of template functions. Its code was deleted in iteration 3 and survives only in git history. Generated by the platform decomposer; leave its files as written. |
|
||||
| 2 | `iter-02-solution-architect-agent/` | complete; step 9 was done in iteration 3 | The rebuild as a hierarchical ReAct agent: Orchestrator, one Specialist per Deliverable, Skills, provider bundle, A2A. |
|
||||
| 3 | `iter-03-kab-layout/` | complete (commit `7ee49ab`) | The container starts the new engine, the engine moved into the KAB workflow-agent folder layout, and the original pipeline was deleted. |
|
||||
| 4 | `iter-04-learning-and-skills/` | steps 1–8, 11, 13 and 15–27 built; cases 01, 02 and 03 completed at 100% on them on 2026-10-07 and 08; ADR-0004 accepted 2026-10-08 (step 9); 10, 12 and 14 planned | The enhancement backlog from the 2026-10-06 review: cheap fixes, the learning loop through Skills, overlay Skills, provider neutrality. Steps 17–20 are the speed-ups from the 2026-10-07 run: a working copy for files and the graph, a provider schema lookup, routing a Check the code cannot meet, and a model timeout per role. |
|
||||
| 4 | `iter-04-learning-and-skills/` | steps 1–8, 11, 13 and 15–27 built; cases 01, 02 and 03 completed at 100% on them on 2026-10-07 and 08; ADR-0004 accepted 2026-10-08 (step 9); the lessons loop is built and its first six lessons are approved and published, not yet proved (step 10); 12 and 14 planned | The enhancement backlog from the 2026-10-06 review: cheap fixes, the learning loop through Skills, overlay Skills, provider neutrality. Steps 17–20 are the speed-ups from the 2026-10-07 run: a working copy for files and the graph, a provider schema lookup, routing a Check the code cannot meet, and a model timeout per role. |
|
||||
| 5 | `iter-05-jev-decisions/` | the Jev client and the Orchestrator router are built (steps 2, 11, 12), unverified against the live service; the rest planned | Jev (a hosted decision model) for the agent's closed decisions: checks, routing, context selection. |
|
||||
| 6 | `iter-06-target-architecture-graph/` | complete: all four cases pass with real models, each run twice on 2026-10-08; thresholds set | The Target architecture as one explicit graph of Elements, Relationships and Checks, established before infrastructure code, with validation as a verdict per Check. |
|
||||
| 7 | `iter-07-change-requests/` | complete (2026-10-09): the change case ran with real models and passed | A user restates a request to say how requirements changed; a new Execution starts from a Baseline Execution of the same Customer case and delivers the updated architecture with what changed. |
|
||||
|
||||