docs: record the first run of the work breakdown structure and of stated choices reaching Checks
Some checks failed
validation / verify (push) Failing after 10s

Case 08: a plan of 9 work packages and 15 activities, 7.2 weeks against a
10-week window, with the customer's carrier circuit on the critical path. The
stated topology was built this time. The owner keeps the estimates as they
are: one experienced engineer, no contingency.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
2026-10-11 21:04:28 +01:00
parent f54af24169
commit b66d18fe94
2 changed files with 24 additions and 0 deletions

View File

@@ -29,3 +29,12 @@ The packager is told to open the executive summary with what the design rests on
Not done: `intent.exclusions` are free text, so nothing in code checks that an excluded thing was not built. The Specialists are told; in case 08 they complied.
Tests: `tests/execution/test_requirements_chain.py` (6 more), `tests/tools/test_local.py` (5 more).
## First run with real models, 2026-10-11
`case-08-landing-zone` again, results `20261011T185421Z`: completed, 91%, 60 minutes, about $11.94.
- **The stated topology was built this time.** `networking.topology` is carried by NFR-2, whose first condition is that a Shared VPC host project is connected to service projects across the environment tiers. The code has a host project and the connections. The run before had neither and passed every Check.
- **Only the pinned provider is in the code.** The run before brought in the GitHub provider.
- **It cost more:** $11.94 against $8.76, with three Revisions of the Target architecture and three of the code, against two and one. Two of them were two Checks that contradicted each other on one key's role, sending the code back and forth before the design was corrected. That is the design's fault, not this step's, but a stricter chain gives a large design more to get wrong.
- **One evaluation check failed, and it is a real finding:** the requirements name "Cloud KMS". The customer asked for keys they control; the product was the analyst's addition.