feat: prove the lessons, check overlays in evaluation, and settle the cost steps
Some checks failed
validation / verify (push) Failing after 13s
Some checks failed
validation / verify (push) Failing after 13s
- Schema review: a dotted path is judged only when it starts at a name the resource type has, so a database flag or a service name is no longer read as a missing setting. Lesson L-04, which worked around that, is retired. - Skill routing: in a Change request the question says what changed. - Evaluation: a case may list code_standards the infrastructure code must meet; case 06 checks its overlay's regions, naming and labels. - Model tiers (iteration 5 step 6): a lighter model for a role's first attempt, named in the provider bundle. Measured on case 03 and left off: Flash saved five cents on the IaC author and took twice the requests. - Steps 7 and 9 decided against on the numbers, recorded in the plans. - Plans: the runs of cases 05 and 06, and the first proof of the lessons on case 03 (no Revision, 22 minutes against 28, quality held). Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
@@ -21,3 +21,7 @@ Differs from the plan: the plan asked a yes or no per pillar. Measured against l
|
||||
Operations and cost are picked for almost every real change, so the saving is two to five advisors of six, not five of six.
|
||||
|
||||
Tests: `tests/execution/test_pillars.py` (3), `tests/execution/test_change_requests.py` (2).
|
||||
|
||||
## Run on 2026-10-09
|
||||
|
||||
`case-05-change-retention` (results `20261009T171336Z`): the Change request consulted 5 pillar advisors, not 6, which is what calibration predicted for this change. The Change request took about 18 minutes and 1.30 million tokens against the Baseline's 30 minutes and 3.09 million (42%), passed every change check, and changed nothing unrequested (0 of 89).
|
||||
|
||||