feat: establish the Target architecture as a graph before code
Design is now approved before any infrastructure code is written (ADR-0005). A new target-architect Specialist produces one graph of Elements, Relationships and Checks; the diagram is rendered from it, deployment guidance must account for every Check, and validation gives a verdict per Check. Requirements, components, products and recommendations carry ids in data files, and a submission with a gap in the Requirements chain is refused. Also in this commit: - Customer cases group Executions, with an intent history per case - lesson candidates are captured when an Execution ends - evaluation gains chain, verdict, judged and interactive checks, and per-case thresholds - Terraform providers are cached between checks - the requirements analyst proposes defaults instead of asking - the legacy-baseline case and the checks that only read it are removed - ADR-0006 (Change requests) accepted; ADR-0004 and ADR-0007 proposed - plans for iterations 4 to 7 under .agents/plans/ Unproven with a real model: no evaluation run has completed on this design. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
@@ -8,9 +8,13 @@ One directory per iteration of this agent. Each holds the plan for that iteratio
|
||||
|---|---|---|---|
|
||||
| 1 | `wf-decompose-65ea49fc2d04/` | complete, superseded | The decomposer's scaffold: a linear four-phase pipeline of template functions. Its code was deleted in iteration 3 and survives only in git history. Generated by the platform decomposer; leave its files as written. |
|
||||
| 2 | `iter-02-solution-architect-agent/` | complete; step 9 was done in iteration 3 | The rebuild as a hierarchical ReAct agent: Orchestrator, one Specialist per Deliverable, Skills, provider bundle, A2A. |
|
||||
| 3 | `iter-03-kab-layout/` | complete (uncommitted) | The container starts the new engine, the engine moved into the KAB workflow-agent folder layout, and the original pipeline was deleted. |
|
||||
| 4 | `iter-04-learning-and-skills/` | planned | The enhancement backlog from the 2026-10-06 review: cheap fixes, the learning loop through Skills, overlay Skills, provider neutrality. |
|
||||
| 3 | `iter-03-kab-layout/` | complete (commit `7ee49ab`) | The container starts the new engine, the engine moved into the KAB workflow-agent folder layout, and the original pipeline was deleted. |
|
||||
| 4 | `iter-04-learning-and-skills/` | steps 1–8 and 15 built; no evaluation run has completed on them; 9 awaits the owner; 10–14 planned | The enhancement backlog from the 2026-10-06 review: cheap fixes, the learning loop through Skills, overlay Skills, provider neutrality. |
|
||||
| 5 | `iter-05-jev-decisions/` | planned, gated on open questions | Jev (a hosted decision model) for the agent's closed decisions: checks, routing, context selection. |
|
||||
| 6 | `iter-06-target-architecture-graph/` | steps 1–10 built; step 11's evaluation run is outstanding, so unproven with real models | The Target architecture as one explicit graph of Elements, Relationships and Checks, established before infrastructure code, with validation as a verdict per Check. |
|
||||
| 7 | `iter-07-change-requests/` | planned; ADR-0006 accepted 2026-10-07; follows iteration 6; its step 8 (removing `deliverables/cases/legacy-baseline/`) was done early on the owner's instruction | A user restates a request to say how requirements changed; a new Execution starts from a Baseline Execution of the same Customer case and delivers the updated architecture with what changed. |
|
||||
|
||||
Numbers record when an iteration was planned, not the order to build in. Build iteration 6 before the remaining steps of iteration 4 (10 to 14) and before iteration 5: it changes the Deliverables, Phases and validation format they build on. Its `MAP.md` lists the effect on each of their steps.
|
||||
|
||||
Two designs sit between iterations 1 and 2 and have no plan directory. Commit `a24a44e` wrapped the pipeline in a compatibility layer that imitated Google ADK without using it (deleted in iteration 3). `.scratch/phase-pipeline/spec.md` then designed a code-sequenced Phase pipeline; ADR-0002 reopened it before any of it was built, and its decision log (D1 to D46) explains how iteration 2's design was reached.
|
||||
|
||||
|
||||