feat: a work breakdown structure with a computed timeline (iteration 10)
Some checks failed
validation / verify (push) Failing after 10s
Some checks failed
validation / verify (push) Failing after 10s
A new Deliverable in the packaging Phase, produced by a delivery planner after validation. - The planner writes the plan as data: work packages that name the Elements they deliver, and activities with days, what each follows, and whether the team or the customer owns it. - Code checks the plan against the design: every Element belongs to a work package, and the activities can be scheduled. - Code computes the schedule, with no more of the team's activities at once than the team has people, and the critical path. - Code writes the WBS dictionary (a work package is done when the Checks on its Elements pass), the activity sequence and a timeline on a relative axis from Day 0. - The plan is checked against the delivery window from the agreed scope; over it, the Deliverable says by how much and names the critical path. - With a start date it also gives calendar dates and a Mermaid Gantt chart. - The timeline is added to the solution guide, and the plan's length is in execution.json and the packaging Approval. Not run with real models. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
@@ -2,7 +2,7 @@
|
||||
|
||||
**Iteration:** 10, Work breakdown structure
|
||||
**Intent:** Deliver a plan for building the Target architecture: work packages traced to its Elements and Checks, activities in sequence, and a timeline on a relative day axis that code computes and draws.
|
||||
**Status:** planned; nothing built
|
||||
**Status:** steps 1 to 4 built on 2026-10-11, without milestones; not run with real models
|
||||
**This directory covers:** steps 1 to 4
|
||||
|
||||
## Sources of truth
|
||||
@@ -15,9 +15,9 @@
|
||||
|
||||
| Step | What | Status |
|
||||
|---|---|---|
|
||||
| 1 | The Deliverable, its Specialist and its data file; every Element in a work package, checked in code | planned |
|
||||
| 2 | The schedule computed in code: start and finish day, critical path, team size as a limit | planned |
|
||||
| 3 | The three views written by code: WBS dictionary, activity sequence list, timeline on a relative axis | planned |
|
||||
| 4 | The delivery window checked; assumptions the plan depends on shown on the timeline; milestones | planned |
|
||||
| 1 | The Deliverable, its Specialist and its data file; every Element in a work package, checked in code | built 2026-10-11 (`steps/step-1-to-4.md`) |
|
||||
| 2 | The schedule computed in code: start and finish day, critical path, team size as a limit | built 2026-10-11 (`steps/step-1-to-4.md`) |
|
||||
| 3 | The three views written by code: WBS dictionary, activity sequence list, timeline on a relative axis | built 2026-10-11 (`steps/step-1-to-4.md`) |
|
||||
| 4 | The delivery window checked; assumptions the plan depends on shown on the timeline; milestones | built 2026-10-11, without milestones (`steps/step-1-to-4.md`) |
|
||||
|
||||
Decisions the owner accepted on 2026-10-11: after validation, in the packaging Phase; grouped by component; the technical build only.
|
||||
|
||||