A new Deliverable in the packaging Phase, produced by a delivery planner after validation. - The planner writes the plan as data: work packages that name the Elements they deliver, and activities with days, what each follows, and whether the team or the customer owns it. - Code checks the plan against the design: every Element belongs to a work package, and the activities can be scheduled. - Code computes the schedule, with no more of the team's activities at once than the team has people, and the critical path. - Code writes the WBS dictionary (a work package is done when the Checks on its Elements pass), the activity sequence and a timeline on a relative axis from Day 0. - The plan is checked against the delivery window from the agreed scope; over it, the Deliverable says by how much and names the critical path. - With a start date it also gives calendar dates and a Mermaid Gantt chart. - The timeline is added to the solution guide, and the plan's length is in execution.json and the packaging Approval. Not run with real models. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
10
CONTEXT.md
10
CONTEXT.md
@@ -89,7 +89,7 @@ _Avoid_: custom prompt, override, plugin
|
||||
### Outputs
|
||||
|
||||
**Deliverable**:
|
||||
A document an Execution produces: the scope, requirements, technical decomposition, product selection, design recommendations, the Target architecture, architecture description, deployment guidance, validation results, or the Solution guide. Each Deliverable depends on others being approved first.
|
||||
A document an Execution produces: the scope, requirements, technical decomposition, product selection, design recommendations, the Target architecture, architecture description, deployment guidance, validation results, the Work breakdown structure, or the Solution guide. Each Deliverable depends on others being approved first.
|
||||
_Avoid_: artifact, output file
|
||||
|
||||
**Dependency**:
|
||||
@@ -120,6 +120,14 @@ _Avoid_: traceability matrix, lineage
|
||||
Something the architecture depends on that the customer's Intent does not say, recorded with the question to put to them. It marks missing information, not a fault in the design, and its answer may change a recommendation.
|
||||
_Avoid_: gap, failure, open issue, assumption (which is a default the agents chose)
|
||||
|
||||
**Work breakdown structure**:
|
||||
The Deliverable that divides building the Target architecture into Work packages and the activities within them, with a timeline on a relative axis of working days. Its schedule is computed from the activities' durations and dependencies, never written.
|
||||
_Avoid_: project plan, roadmap, schedule (which is one view of it)
|
||||
|
||||
**Work package**:
|
||||
A unit of the build that delivers named Elements, and is done when the Checks on those Elements pass.
|
||||
_Avoid_: task, epic, phase (which groups Deliverables), workstream
|
||||
|
||||
**Solution guide**:
|
||||
The packaged Deliverable that assembles every other Deliverable into the Cloud provider's solution architecture template.
|
||||
_Avoid_: final report, package
|
||||
|
||||