Every Execution now begins by agreeing the scope, before requirements.
- A new Phase and Deliverable, produced by a scope analyst with two tools:
scope_read shows what is settled and what is not; scope_set records fields
with where each value came from (the request, the customer's answer, or an
assumption with its reason). Code checks each value against the catalogue.
- With someone present the analyst asks for what is missing; with nobody
present it assumes it, visibly. With no spec it drafts one from the request.
A value the customer stated in the file is changed only by their own answer.
- A submission cannot leave an essential field unknown. Code writes the
completed spec, the data every later Specialist reads, and the information
register, from what was recorded.
- The spec's status follows the Execution: under review, approved, then
locked as a Baseline. A Change request starts from the delivered scope.
- The requirements analyst derives from the agreed scope and no longer asks
for what it settles.
About 80 tests assumed requirements came first; tests/scoped.py runs scoping
ahead of a test's own script, and tests about order and counts are updated.
Not run with real models.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Case 04 (interactive)
- A scripted answer may name who it is for, so facts written for
requirements discovery are not given to a Specialist confirming a draft.
- A reply that restates what the agreed requirements already say is read
as an answer, not a request for changes.
- With a user present, a first submission is refused until the user has
been shown a draft of that Deliverable (CONFIRM_DRAFTS).
Routing and reviews
- Intake: a message that starts something is read first. A question is
answered and starts nothing; a change to delivered work starts as a new
request with a note, until Change requests are built.
- Requirements and recommendations list what infrastructure code can show
(conditions) apart from what it cannot (outside_code); the latter needs
no Check and validation proposes nothing for it.
- A requirements review, "names no products", behind its own switch (off).
- Each pillar advisor reviews its pillar's checklist; the engine writes the
reviews into the design recommendations. The judged checklist check went
from 9-45% a pillar to 100% in one run of case 04.
Evaluation
- Per-case thresholds for Revisions, seconds and tokens, set from every
completed run on this build.
- A progress file after every agent run, so an interrupted run keeps its
time and tokens.
- eval/calibrate_judge.py with a 32-question set awaiting a person's
labels. Unlabelled: Jev stable at 1.00, Gemini 0.92, agreeing on 0.91.
Smaller
- An Execution that ends with warnings writes its Deliverables, with the
warnings and each status in the manifest.
- CI installs the application's dependencies before linting and testing.
- A load-balancer pattern in the IaC patterns Skill.
Plans record nine runs of 2026-10-08. Iteration 6 is complete.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
After case 02 (completed at 100%, but with two Revisions of the Target
architecture for gaps validation found one pass at a time):
- A Deliverable stands while what it was written from is unchanged. The
architecture description is written from the Elements and Relationships,
so a Revision that only adds or rewords Checks no longer runs the describer.
- Non-functional requirements and recommendations list their conditions,
one entry per separate thing that must be true; submission requires them.
- A coverage review at submission (JEV_COVERAGE_REVIEW, off by default):
for each condition, Jev chooses which Check verifies it, or none. Asked as
one broad yes-or-no per requirement it could not tell a complete design
from one with known gaps; asked as a choice per condition it raised all
four known gaps of case 02 and nothing on the complete graph. An opt-in
live test (LIVE_JEV=1) repeats that.
- The validator is told to report every gap in its first pass.
Plans record the case 02 run and both forms of the review with figures.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
After deployment guidance was reopened, the Orchestrator's context still
carried the previous validation's verdicts, so it reopened the code for the
same Check three times without a validation in between (evaluation run of
2026-10-07, case 01). Record that run in the iteration 6 plan.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Design is now approved before any infrastructure code is written (ADR-0005).
A new target-architect Specialist produces one graph of Elements,
Relationships and Checks; the diagram is rendered from it, deployment
guidance must account for every Check, and validation gives a verdict per
Check. Requirements, components, products and recommendations carry ids in
data files, and a submission with a gap in the Requirements chain is refused.
Also in this commit:
- Customer cases group Executions, with an intent history per case
- lesson candidates are captured when an Execution ends
- evaluation gains chain, verdict, judged and interactive checks, and
per-case thresholds
- Terraform providers are cached between checks
- the requirements analyst proposes defaults instead of asking
- the legacy-baseline case and the checks that only read it are removed
- ADR-0006 (Change requests) accepted; ADR-0004 and ADR-0007 proposed
- plans for iterations 4 to 7 under .agents/plans/
Unproven with a real model: no evaluation run has completed on this design.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>