The change-case check asked for a changed Check whose source is the changed
requirement. A functional requirement is carried by the components that
serve it, so it is reached through a Check on an Element realising one.
Plans record the first Change request with real models: a retention change
made in 18 minutes for a third of its Baseline's tokens, touching seven
Checks on one Element and nothing else, and the regression runs of cases
02, 03 and 04, all at 100%. Iteration 7 is complete.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
A caller restates a request to say how requirements have changed, naming a
completed Execution of the same Customer case as the Baseline.
- app/baseline.py reads a Baseline from its files and refuses one that
does not exist, did not complete or belongs to another case, before
anything runs or is recorded. A Baseline is never modified.
- Requirements carry a change (unchanged, added, changed, removed) and a
reason. Submission is refused when a Baseline requirement disappears, an
id is reused, or an unchanged requirement's text differs. A removed
requirement stays on record and asks nothing downstream.
- Each Specialist starts from its delivered version; the graph and the code
are its working copy, and the description is carried over when the
design's shape is the same.
- app/workflows/changes.py compares versions by id and traces what each
changed requirement reaches; anything else that changed is listed as
unrequested. Approvals show the change for their Phase, and changes.json
is written with the full Deliverables.
- Intake no longer starts a message read as a change: it names the
Execution to give as the Baseline.
- A fifth evaluation case runs a request and then a change to it, with
four checks that the change is recorded, reaches Checks, stays contained
and costs less than its Baseline.
Tested with scripted agents only; no Change request has run with real
models.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>