# Step 1 — Implementation Detail ADR-0005 was accepted by the owner on 2026-10-07 ("lets move forward with this", after reviewing the proposed case structure), with its three points as written: 1. The user approves the Target architecture before code is written; the solution architecture Phase is split, making five Phases. 2. A new Specialist produces the Target architecture. 3. Code renders the diagram from the graph; the diagrammer role is removed. ADR-0006 (Change requests) was accepted in the same reply; it is built in iteration 7. Clarifications the owner gave before accepting, now in the ADR and the role files: - The graph is the Target architecture itself, not a build plan beside it. - The user states Intent at a high level in the Workflow request. The agents derive every Element, Relationship and Check from the architecture framework and best practice; the user never writes the graph.