# Plan Map **Iteration:** 10, Work breakdown structure **Intent:** Deliver a plan for building the Target architecture: work packages traced to its Elements and Checks, activities in sequence, and a timeline on a relative day axis that code computes and draws. **Status:** steps 1 to 4 built on 2026-10-11, without milestones; not run with real models **This directory covers:** steps 1 to 4 ## Sources of truth - `.scratch/scoping-and-work-breakdown/spec.md`, section "The work breakdown structure". - `docs/adr/0005-the-target-architecture-is-an-explicit-graph.md`: the ids it traces to. - Iteration 9 step 1: the scope spec's `delivery` section (team size, window, commercial model). ## Status | Step | What | Status | |---|---|---| | 1 | The Deliverable, its Specialist and its data file; every Element in a work package, checked in code | built 2026-10-11 (`steps/step-1-to-4.md`) | | 2 | The schedule computed in code: start and finish day, critical path, team size as a limit | built 2026-10-11 (`steps/step-1-to-4.md`) | | 3 | The three views written by code: WBS dictionary, activity sequence list, timeline on a relative axis | built 2026-10-11 (`steps/step-1-to-4.md`) | | 4 | The delivery window checked; assumptions the plan depends on shown on the timeline; milestones | built 2026-10-11, without milestones (`steps/step-1-to-4.md`) | Decisions the owner accepted on 2026-10-11: after validation, in the packaging Phase; grouped by component; the technical build only.