Files
gcp_solution_architecture_a…/.agents/plans/iter-10-work-breakdown/steps
Jonathan Boniface b66d18fe94
Some checks failed
validation / verify (push) Failing after 10s
docs: record the first run of the work breakdown structure and of stated choices reaching Checks
Case 08: a plan of 9 work packages and 15 activities, 7.2 weeks against a
10-week window, with the customer's carrier circuit on the critical path. The
stated topology was built this time. The owner keeps the estimates as they
are: one experienced engineer, no contingency.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-11 21:04:28 +01:00
..