feat: working orhcestration engine
This commit is contained in:
25
.agents/plans/iter-01-execution-engine/MAP.md
Normal file
25
.agents/plans/iter-01-execution-engine/MAP.md
Normal file
@@ -0,0 +1,25 @@
|
||||
# Plan Map
|
||||
|
||||
**Iteration:** 1, the Execution engine
|
||||
**Intent:** An installable package that holds one Execution of any Workflow, built from the Reference without changing it.
|
||||
**Status:** steps 1 to 6 built on 2026-10-13; 529 tests pass
|
||||
|
||||
## Sources of truth
|
||||
|
||||
- `.scratch/engine/spec.md`: the Workflow and what each step brings.
|
||||
- `docs/adr/0001-the-execution-engine-takes-a-workflow.md`, `docs/adr/0002-built-from-a-reference-that-is-never-modified.md`.
|
||||
- `REFERENCE.lock.json`: what has been brought, and from which commit.
|
||||
|
||||
## Status
|
||||
|
||||
| Step | What | Done when | Status |
|
||||
| --- | --- | --- | --- |
|
||||
| 1 | The repository: package, vocabulary, the two ADRs, the bring script | The package installs | built 2026-10-13 (`steps/step-1.md`); both ADRs accepted by the owner on 2026-10-13 |
|
||||
| 2 | The modules that depend on nothing about a subject, with their tests | Those tests pass | built 2026-10-13 (`steps/step-2.md`) |
|
||||
| 3 | The Workflow value and its hooks; the modules that name Deliverables brought and rewritten to use it | No engine module names a Deliverable | built 2026-10-13 (`steps/step-3.md`); wording and a few fields of the Reference's remain, listed there |
|
||||
| 4 | A toy Workflow, with a small agent root under `tests/` (role files, a bundle, stand-in Skills) | It completes on the fake runtime through a question, an Approval, a Revision and a Change request; the role loader, the assembly and the A2A server are tested on it | built 2026-10-13 (`steps/step-4.md`), with four Deliverables in three Phases |
|
||||
| 5 | The Reference's workflow as an example in the tests | The Reference's tests for its graph, checks and hooks pass against it | built 2026-10-13 with step 3 (`steps/step-3.md`); six of its test files are not brought; `steps/step-4.md` says what that leaves untested |
|
||||
| 6 | The digest step: sources to a spec, adapters listed by a Workflow, provenance per value | The toy Workflow starts from a digested spec | built 2026-10-13 (`steps/step-6.md`) |
|
||||
| 7 | How an agent's container build obtains the engine | One agent image builds from a clean checkout | in progress: the owner chose on 2026-10-20 a named build context for local builds (`--build-context engine=../orchestration_engine`) and a pinned-commit dependency for CI; built as step 1 of `../tom_analysis/.agents/plans/iter-02-platform-deployment/` |
|
||||
|
||||
Steps 3 and 5 were built together: the Reference's workflow is what the converted modules are tested with. Step 4 follows them. Steps 6 and 7 depend on 4.
|
||||
Reference in New Issue
Block a user