Files
tom_analysis_agent/.agents/plans/README.md

808 B

Plans

One directory per iteration. ../../IMPLEMENTATION_PLAN.md is the plan across this repository and the engine's; its steps T1 onward are built here.

# Directory Status What it is
1 iter-01-first-slice/ the Workflow, its checks and views built on 2026-10-13 from a written operating spec; the digest and evaluation remain Six Deliverables, from an operating spec to a priced, validated operating model
2 iter-02-platform-deployment/ steps 1 to 3 built 2026-10-20; step 4 in progress The agent as a container on the local KAB platform, then behind the Orchestration engine

Each iteration has a MAP.md (intent, each step's status, sources of truth) and steps/step-N.md, written when a step is finished. A step with no file is not done.