- Validator budget 15 to 30: recording verdicts in pieces for 100 Checks used all 15 calls in one attempt. - Plans record three runs on 2026-10-08: case 02 completed at 100% with no Revision in 24 minutes; case 03 completed at 100% with two Revisions of the design in 40 minutes; case 04 (interactive) ended with warnings at 75%, on two router faults: a reply that echoes the question is read as a change request, and the router loops at the Revision limit. Neither is fixed here. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
4.8 KiB
Plan Map
Iteration: 6, the Target architecture graph
Intent: Establish the Target architecture as one explicit graph of Elements, Relationships and Checks before any infrastructure code is written, and derive and check every later Deliverable from it, so that the outcome is understood before code exists and validation has a fixed bar.
Status: steps 1 to 10 built; cases 01, 02 and 03 completed at 100% with real models on 2026-10-07 and 08 (steps/step-11.md); case 04, the interactive one, does not complete
This directory covers: steps 1 to 11
Order of work
Build this iteration before the remaining steps of iteration 4 (10 to 14) and before iteration 5. It changes Deliverables, Phases and the validation format that those steps build on. The effects on them are listed at the end of this file.
Sources of truth
docs/adr/0005-the-target-architecture-is-an-explicit-graph.md: the decision, its three points to confirm, and the rejected alternatives. Statusproposed.CONTEXT.md: Target architecture, Element, Relationship, Check, Requirements chain. Use these words; "Dependency" stays the link between Deliverables.iter-04-learning-and-skills/steps/step-8.md, "The evaluation run of 2026-10-06": the evidence. Three validation passes gave 4, 7, then 5 different findings on the same Terraform.docs/adr/0002-*.md: the graph's format and how to write it are behaviour, so they live in a Skill; the engine only checks the result.
The flow this iteration builds
flowchart TD
REQ([Workflow request]) --> R[Requirements]
R --> D[Technical decomposition]
D --> A1{{Approval: requirements discovery}}
A1 --> PS[Product selection]
PS --> DR[Design recommendations]
R --> DR
PS --> TA
DR --> TA[Target architecture: Elements, Relationships, Checks]
TA --> A2{{Approval: design}}
A2 --> DESC[Architecture description]
A2 --> IAC[Deployment guidance]
TA -.rendered by code.-> DIA[Architecture diagram]
IAC --> A3{{Approval: implementation}}
DESC --> A3
A3 --> VAL[Validation: a verdict per Check]
VAL -->|a Check fails| IAC
VAL -->|the graph is missing something| TA
VAL -->|every Check passes| A4{{Approval: validation}}
A4 --> G[Solution guide]
G --> A5{{Approval: packaging}}
Status
| Step | What | Size | Status |
|---|---|---|---|
| 1 | Accept ADR-0005 | S | complete: accepted 2026-10-07 |
| 2 | Identify requirements, components and recommendations by id | M | complete |
| 3 | The graph: format, parsing and structural rules | M | complete |
| 4 | The Target architecture Deliverable, its Specialist and its Skill | M | complete; unproven with a real model |
| 5 | Completeness: the Requirements chain is a submission rule | M | complete |
| 6 | Split the solution architecture Phase: design, then implementation | M | complete |
| 7 | The diagram is rendered from the graph | S | complete |
| 8 | Deployment guidance implements the graph | M | complete |
| 9 | Validation gives a verdict per Check | M | complete |
| 10 | Revision routing: the code or the graph | S | complete; routing unproven with a real model |
| 11 | Evaluation: prove the loop converges | M | cases 01, 02 and 03 pass at 100%; case 04 (interactive) ends with warnings at 75% on two router faults (steps/step-11.md); thresholds outstanding |
Size: S under a day, M a few days.
Dependency graph
- Step 1: no dependencies
- Step 2: depends on step 1
- Step 3: depends on step 1
- Step 4: depends on step 3
- Step 5: depends on step 2, step 4
- Step 6: depends on step 4
- Step 7: depends on step 4
- Step 8: depends on step 5
- Step 9: depends on step 8
- Step 10: depends on step 6, step 9
- Step 11: depends on step 7, step 10
Steps 2 and 3 can be built side by side, as can 6 and 7.
Effects on other iterations
- Iteration 4 step 1 (
findings.json): replaced by the verdicts of step 9 here. The free-form finding list goes. - Iteration 4 step 4 (contracts): the diagram's contract goes with the diagrammer; the decomposition's component table becomes data in step 2 here.
- Iteration 4 step 6 (Orchestrator step order): rewritten by step 10 here.
- Iteration 4 step 7 (lesson candidates):
findingcandidates become failed Checks and proposed additions. - Iteration 4 step 8 (evaluation):
no_blocking_findingsis rewritten against verdicts; the unset thresholds are set by step 11 here. - Iteration 4 step 11 (IaC patterns Skill): its patterns should be keyed by the product of an Element.
- Iteration 4 step 13 (trim Specialist context): mostly achieved here, since later Specialists work from the graph. Re-scope it after step 11.
- Iteration 5 step 5 (finding-to-Deliverable routing): no longer needed; a failed Check already names what it applies to.
- Iteration 5 step 4 (semantic checks at submission): can judge whether each Check is verifiable as written.